Midway Rising
Bowman is providing full-service engineering, surveying and mapping services to support the redevelopment of Midway Rising, a mixed-use redevelopment designed to revitalize San Diego’s Midway neighborhood.
Bowman is providing full-service engineering, surveying and mapping services to support the redevelopment of Midway Rising, a mixed-use redevelopment designed to revitalize San Diego’s Midway neighborhood.
The Fire Risk Mitigation (FiRM) project is part of San Diego Gas & Electric’s broader system hardening program, developed to reduce wildfire risk in high-vulnerability areas of Southern California. The initiative focused on upgrading 12 kV distribution circuits to improve both public safety and long-term system resiliency.
This program provides comprehensive engineering support for Distribution Volt/VAR Control (DVVC) implementation and ongoing system maintenance, with an emphasis on grid modernization and reliability improvements. A key component of the work includes dashboard management, ensuring operators have accurate, real-time data to monitor performance and guide decision-making.
Our team provides ongoing support to Pacific Gas and Electric Company (PG&E) through comprehensive system inspections designed to improve safety, reliability and regulatory compliance across utility assets. The program integrates both imagery reviews and ground-based assessments to deliver a thorough evaluation of infrastructure conditions in fire-prone regions of California.
Our team supported the development of a 2,600-acre, multi-phase solar and battery energy storage system (BESS). The project combines 400 MW of solar generation with 120 MW of storage, advancing large-scale renewable deployment and contributing to California’s clean energy goals.
Our team provided comprehensive engineering and permitting services for a large-scale, ~1,800-acre PV solar development. This facility brings more than 300 MW of renewable energy to the grid, contributing to California’s clean energy goals and long-term sustainability targets.
Our team supported the development of a 600-acre, 105 MW solar facility with an integrated 20 MW battery energy storage system (BESS). The project combines solar generation with on-site storage to improve energy reliability and flexibility, aligning with California’s clean energy targets.
Our team delivered engineering and permitting services for a state-of-the-art, 200 MW battery energy storage system (BESS). Spanning approximately 10 acres, the project incorporates advanced design and infrastructure features to support grid stability and enhance regional energy reliability.
Our team conducted a comprehensive laser scan of the structure, creating detailed as-built CAD models that were seamlessly adapted into Revit for the client’s construction and design needs for this historic 10-story building in the Fashion District of Downtown Los Angeles.
Our team served as Engineer of Record for LA Metro’s Westside Purple Line Extension, designing Century City/Constellation Station and reviewing plans for Wilshire/Rodeo Station. The project demanded advanced soil-structure interaction, 3D modeling, and excavation support to ensure stability beneath densely developed areas along Wilshire Boulevard, factoring in seismic resilience and loading impacts from nearby high-rise buildings in this urban infrastructure initiative.