Naper South

Posted on March 26th, 2024 by Renee Narvaez

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years.

Los Altos Park Renovation

Posted on March 25th, 2024 by Renee Narvaez

Our team provided subsurface utility engineering, professional surveying, civil engineering, and UAV services to support the planning, design and construction of a major city park renovation to an approximately 40-acre existing public facility in Albuquerque, NM.

Rockcliff Energy Saltwater Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.

Preliminary Survey for Natural Gas Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

Pipeline Integrity Support

Posted on February 28th, 2024 by Jillian Taylor

Bowman was contracted to provide integrity support services for 41 miles of pipeline across East Texas and Northwest Louisiana. To ensure the reliability and safety of the energy infrastructure, our team conducted depth of cover surveys to assess the position of pipelines beneath the surface.

Gas Gathering Collection System Survey

Posted on February 28th, 2024 by Jillian Taylor

Bowman was engaged to provide open ditch as-built surveys for 315 miles of natural gas gathering systems. Bowman not only provided an accurate representation of the existing infrastructure but also served as a valuable resource for future maintenance, expansion and regulatory compliance.

Madbush Falls

Posted on February 9th, 2024 by Jillian Taylor

Madbush Falls – Riders’ Outpost was an exciting project involved a complete rehabilitation and transformation of an abandoned old motel and bar known as the Madbush Alpine Chalet in Waitsfield, VT along VT Route 100 a few miles from the Sugarbush Ski Resort.

Costco Permitting & Design

Posted on February 9th, 2024 by Jillian Taylor

Our team has worked with Costco since its beginnings in Vermont in Colchester in 1992. At the time the site had a different building by the name of Bio-Tech that was razed to build the first and only Costco in Vermont. Since then, we have worked with Costco over the years in adding small additions to the site, such as the tire center.

Planned Unit Development (PUD) Project

Posted on February 9th, 2024 by Jillian Taylor

This mixed-use space is a large industrial building that is being re-purposed, and will provide maker space, bicycle repair, work from “home” space, storage, and more. Progress on this project has included extending the bike path to encourage non-vehicular traffic.

Twin Farms Resort

Posted on February 8th, 2024 by Jillian Taylor

The Twin Farms Resort project involved a series of renovations, expansions and new units to the Forbes Travel #1 5-star small luxury hotel and resort in the quaint and quiet town of Barnard, Vermont. Our team was retained to provide surveying, site/civil engineering, permitting, environmental and construction engineering services.